Westberg · Kungsbacka, Sweden
Santa Maria terminal: Project management, Kungsbacka
New construction for a cargo terminal with excavation, compaction and piling. Westberg provided project management, risk analysis, pre- and post-inspections of nearby buildings and vibration monitoring.

The challenge
Construction of a new freight terminal involved vibration-generating excavation, compaction and piling.
What we did
Westberg provided project management, prepared a risk analysis and carried out pre- and post-work inspections of nearby buildings and vibration measurements on them.
Facts
The project in brief
- Location
- Kungsbacka, Sweden
- Customer group
- Buildings & Infrastructure
- Capabilities
- Air, Noise, Vibration & Odour
- Customer needs
- Manage environmental impacts during construction
Related projects
Similar projects

Westberg · Stockholm
Kv Grönskär och Kv Söderarm: Project support and vibration monitoring, Stockholm
Two new residential blocks next to Kärrtorp metro station, with blasting, excavation, compaction and sheet piling in a dense urban area. Westberg provided project support, pre- and post-inspections of buildings and the metro platform, vibration monitoring near the tracks, requirements for medical equipment and damage investigations.

Westberg · Luleå
Skanska: Risk analysis, Luleå
Westberg prepared the risk analysis and carried out inspections and vibration monitoring throughout the project. Noise was measured during piling to make sure noise limits were met.

Westberg · Luleå
Serneke: Risk analysis and vibration monitoring, Luleå
Westberg carried out risk analysis, inspection and vibration monitoring for Serneke.