Envima · Sweden · 2026
IGF Biogas: ISO 9001 and ISO 14001 management systems and certification, Sweden
IGF Biogas turns organic residues into local renewable energy and is expanding fast. Envima supports the company through the whole process of introducing an integrated ISO 9001 and ISO 14001 management system and certification.

Envima · Tranås · 2025
Strömsholmen (KALLER): double materiality analysis, LCA and legal monitoring, Tranås
Strömsholmen in Tranås, maker of KALLER gas springs, used double materiality analysis, gap analysis and life cycle assessments to see where its climate impact arises. Envima also supports the company with legal monitoring through E-paragrafen, chemical assessments, work environment and training.

Envima · Sweden · 2025
Schneider Electric: product environmental assessments and EPDs, Sweden
Schneider Electric works with environmental assessments of its products. Envima supports product assessments, registration in Byggvarubedömningen and work with environmental product declarations (EPD).

Envima · Sweden · 2025
Implema: CSRD double materiality and gap analysis, Sweden
Implema, a business-systems consultancy with more than 200 employees, needed to understand CSRD both for itself and for its customers. Envima carried out a double materiality analysis and gap analysis with the company.

Envima · Linköping · 2025
Hjulsbro Steel: LCAs, EPDs and environmental compliance, Linköping
Hjulsbro Steel in Linköping makes prestressing strand used in bridges, railway sleepers and tunnels. Envima produces annual LCAs and EPDs for three products and supports permits and sampling, ISO 14001 and sustainability reporting.

Envima · Sweden · 2025
Lundbergs Fastigheter: legal monitoring through E-paragrafen, Sweden
Lundbergs Fastigheter, one of Sweden's largest private property companies, has used Envima's legal monitoring for about 20 years. An Envima lawyer reviews the company's legal requirements twice a year.

Envima · Nyköping · 2025
X Shore: environmental permit for the electric boat factory, Nyköping
X Shore builds electric boats at its factory in Nyköping. To scale up to 800 boats a year the factory needed an environmental permit, and Envima led the work through risk assessments and the permit application.

Envima · Sweden · 2025
THISAB: double materiality analysis, training and sustainability advice, Sweden
After 50 years in Swedish engineering, THISAB decided to be at the forefront of sustainability without being covered by CSRD. Envima provides staff training, a double materiality analysis and sustainability coaching.

Westberg · Stockholm
Kv Grönskär och Kv Söderarm: Project support and vibration monitoring, Stockholm
Two new residential blocks next to Kärrtorp metro station, with blasting, excavation, compaction and sheet piling in a dense urban area. Westberg provided project support, pre- and post-inspections of buildings and the metro platform, vibration monitoring near the tracks, requirements for medical equipment and damage investigations.

Westberg · Luleå
Skanska: Risk analysis, Luleå
Westberg prepared the risk analysis and carried out inspections and vibration monitoring throughout the project. Noise was measured during piling to make sure noise limits were met.

Westberg · Luleå
Serneke: Risk analysis and vibration monitoring, Luleå
Westberg carried out risk analysis, inspection and vibration monitoring for Serneke.

Westberg · Skellefteå
Nåiden Bygg: Inspection and vibration monitoring, Skellefteå
Westberg inspected surrounding properties in line with the risk analysis. Vibration is monitored throughout the project.

Westberg · Skellefteå
Skellefteå kommun: Vibration monitoring during water and sewer works, Skellefteå
Vibration monitoring during replacement of water and sewer pipes for Skellefteå municipality.

Westberg · Gothenburg
Bergsfallet: Risk analyses and measurements, Gothenburg
A new apartment building with blasting, excavation, compaction and piling in a dense urban area. Westberg provided project support, risk analysis, pre- and post-inspections, vibration monitoring, damage investigations and handling of Kretslopp och Vatten's infrastructure.

Westberg · Gothenburg
Ekmansgatan: Damage investigations and vibration monitoring, Gothenburg
A new combined residential and office building about 100 metres from Avenyn. Westberg provided project support, risk analysis, pre- and post-inspections, vibration monitoring, damage investigations and handling of Kretslopp och Vatten's infrastructure.

Westberg · Helsingborg
Luna: Vibration monitoring, Helsingborg
A new 16-storey apartment building with excavation, compaction and piling in a dense urban area. Westberg provided project support, risk analysis, pre- and post-inspections, vibration monitoring and damage investigations.

Westberg · Kungsbacka
Santa Maria terminal: Project management, Kungsbacka
New construction for a cargo terminal with excavation, compaction and piling. Westberg provided project management, risk analysis, pre- and post-inspections of nearby buildings and vibration monitoring.

Westberg · Gothenburg
SEEL (Chalmers and RISE): Risk analysis, Gothenburg
The Swedish Electric Transport Laboratory (SEEL) is a test facility for electromobility owned by Chalmers and RISE. Westberg prepared a vibration risk analysis for excavation, compaction and piling next to Säve airport.

Westberg · Västerås
Sågklingan 6: Project support and risk analysis, Västerås
Apartment buildings in three blocks where foundation work causes vibration. Westberg provided project support, risk analysis, pre- and post-inspections and vibration monitoring.

Westberg · Uppsala
Brf Normann: Risk analysis and vibration monitoring, Uppsala
A residential project in Norra Luthagen, Uppsala. Westberg provided project support, risk analysis, pre- and post-inspections and vibration monitoring.

Westberg · Umeå
Kv Verkstad: Risk analysis, Umeå
Six buildings with an underground car park in the Verkstan block at Teg. Westberg provided project support, risk analysis, pre- and post-inspections and vibration monitoring.

Westberg · Skellefteå
Kv Släden: Inspections and vibration monitoring, Skellefteå
The first phase of a new residential area with about 70 homes. Westberg provided project support, risk analysis, pre- and post-inspections and vibration monitoring.

Westberg · Skellefteå
Kv Storfågeln: Risk analysis and noise measurement, Skellefteå
298 timber-built homes north of Skellefteå centre. Westberg provided project support, risk analysis, pre- and post-inspections, noise measurement and vibration monitoring.

Westberg · Skellefteå
Skebo: Project support and measurements, Skellefteå
Two residential buildings with 74 apartments. Westberg provided project support, risk analysis, pre- and post-inspections and vibration monitoring.

Westberg · Skellefteå
Kv Oxen: Risk analyses and vibration monitoring, Skellefteå
A new office building with a green brick facade in central Skellefteå. Westberg provided project support, risk analysis, pre- and post-inspections and vibration monitoring.

Westberg · Kungälv
Nordtag: Vibration monitoring, Kungälv
Development of a new residential area with excavation, compaction and blasting. Westberg provided project support, risk analysis, pre- and post-inspections and vibration monitoring.

Westberg · Nacka
Nacka Padel: Project management and risk analysis, Nacka
A new padel arena with blasting, excavation and compaction in a dense area next to busy roads. Westberg provided project support, risk analysis, pre- and post-inspections of buildings and infrastructure, vibration monitoring and damage investigations.

Westberg · Järfälla
Viksjö: Vibration monitoring and risk analysis, Järfälla
A new apartment building with excavation, compaction and piling in a dense urban area. Westberg provided project support, risk analysis, pre- and post-inspections and vibration monitoring.

Westberg · Gothenburg and Alingsås
Balder: risk analyses in the design group, Gothenburg and Alingsås
Westberg is part of Balder's design group, preparing risk analyses for projects including Brogården in Alingsås and P-hus Väst and Öst on Långströmsgatan, Bergskristallen and Hovås Höjd in Gothenburg.

Westberg · Enköping
Norra Hamnen: Risk analysis and vibration monitoring, Enköping
A new apartment building in central Enköping with excavation, compaction and piling. Westberg provided project support, risk analysis, pre- and post-inspections, vibration monitoring and damage investigations.

Natur og Samfunn · Nordland · 2024
Miljødirektoratet: protected forest and moist forest mapping, Nordland
Mapping of areas with forest protection and moist forest in Nordland for the Norwegian Environment Agency.

Natur og Samfunn · Trøndelag, Nordland, Agder, Innlandet · 2024
Miljødirektoratet: NiN nature mapping in four counties, Trøndelag, Nordland, Agder, Innlandet
Nature mapping under the NiN method for the Norwegian Environment Agency, covering areas in Trøndelag, Nordland, Agder and Innlandet in 2024.

Natur og Samfunn · Agder · 2024
Norskog: MiS forest mapping, Agder
MiS mapping (environmental records in forests) for Norskog on several properties in Agder.

Natur og Samfunn · Oppdal · 2023
Oppdal kommune: nature mapping for the Gjevilvassdalen ski trail, Oppdal
Nature mapping in connection with planning a new ski trail route in Gjevilvassdalen for Oppdal municipality.

Natur og Samfunn · Vestvågøy · 2022
Vestvågøy kommune: municipal nature diversity plan, Vestvågøy
Collection of baseline data on nature diversity and preparation of the municipal sub-plan with its action plan. The work covered habitat sites, water bodies, functional areas, red-listed and alien species, plus field visits.

Natur og Samfunn · Kristiansand
Statens vegvesen: natural environment impact assessment for Ytre ringveg, Kristiansand
Impact assessment on the natural environment for the zoning plan for Ytre ringveg in Kristiansand, for the Norwegian Public Roads Administration.

Natur og Samfunn · Jondal–Mauranger
Statnett: red-listed species survey for a new power line, Jondal–Mauranger
Field registration of red-listed species along a new power line route between Jondal and Mauranger for Statnett.

Natur og Samfunn · Rogaland
Fylkesmannen i Rogaland: bottom fauna and algae surveys in 65 streams, Rogaland
65 streams were surveyed for bottom fauna and algae for the County Governor of Rogaland.

Natur og Samfunn · Troms
Norconsult: NiN baseline mapping of Øvre Reisadalen national park, Troms
Øvre Reisadalen national park was mapped using the Nature in Norway (NiN) method, for Norconsult.

Natur og Samfunn · Sommarøy
Tromsø kommune: restoration and revegetation of a former caravan site, Sommarøy
Restoration and revegetation of a former caravan parking area for Tromsø municipality.

Natur og Samfunn · Bodø · 2018
BREEAM commercial building: ecological assessment for BREEAM certification, Bodø
The BREEAM Ecology process for a new commercial building in Bodø.

Natur og Samfunn · Orkla · 2018
Orkla river restoration: restoration plans for two oxbow lakes, Orkla
Action plans with cost estimates for restoring two oxbow lakes in the Orkla river system.

Etha · Pieksämäki · 2022
Sarvikankaan Tuuli Oy: Sarvikangas wind farm development, EIA and transaction advice, Pieksämäki
The Sarvikangas wind farm in Pieksämäki covers 2,860 hectares and is planned for 25 turbines and 200 MW. Etha has been involved since the preliminary studies in 2022 and supports development, EIA, land-use planning and the search for investors.

Etha · Maalahti · 2018
Local developer; owner IKEA: Långmossa wind farm development, Maalahti
Långmossa in Maalahti has seven turbines of about 30 MW, is owned by IKEA and operated by OX2. Etha supported development from the initial idea in 2012 to the investment decision in 2018 – its first full-scope development project.

Etha · Finland
Ilmatar Energy: technical due diligence of wind and solar projects, Finland
Etha reviewed Ilmatar's portfolio of 27 wind and solar projects with about 3,500 MW, supporting debt financing of EUR 144.5 million from a major European debt investor.

Etha · Lestijärvi
Kymppivoima, Oulun Energia, Kuopion Energia: technical transaction advice for the Lestijärvi wind farm, Lestijärvi
Etha acted as technical advisor for the buyers – Kymppivoima, Oulun Energia and Kuopion Energia – when OX2 sold the 455 MW Lestijärvi wind farm, Finland's largest.

Etha · Pieksämäki
Helen and Ålandsbanken Wind Power Fund: technical due diligence and contract review for the Niinimäki wind farm, Pieksämäki
Etha provided full-scope technical due diligence and contract review for Helen and Ålandsbanken's wind fund when they acquired the 145 MW Niinimäki wind farm in Pieksämäki from OX2.

Etha · Huittinen
Karsittu Green Energy Oy: development, EIA and engineering for Karsittu solar and battery storage, Huittinen
Etha is project development consultant for the Karsittu solar power project (100 MW solar and 130 MWh battery storage) in Huittinen. Work includes project management, EIA support, layout and energy yield; the zoning plan has gained legal force.

Etha · Kokemäki · 2025
Silokallio solar farm: project management and engineering, Kokemäki
For the 60 MWp Silokallio solar farm in Kokemäki, Etha managed the project and stakeholders and carried out layout, energy yield, feasibility and visual impact studies through to building permit.

Etha · Pyhäjärvi · 2026
SENS and Dovre Group: transaction advice and permitting for 85 MW / 170 MWh battery storage at Pyhäsalmi mine, Pyhäjärvi
The 85 MW / 170 MWh Pyhäsalmi battery energy storage project was sold on 10 March 2026 in a transaction worth about EUR 5.5 million. Etha provided sell-side transaction advice and permitting support to SENS and Dovre.

Etha · Isojoki
Isojoki Data Center Oy: planning and permitting for a data centre, Isojoki
Isojoki Data Center Oy is developing a 40 MW data centre campus on about 180 hectares in western Finland. Etha manages and coordinates the planning and permitting processes from early planning to construction readiness.

Natur og Samfunn · Salten
Drageid quarry: natural environment impact assessment, Salten
Natur og Samfunn carried out an impact assessment of the natural environment for a quarry at Drageid in Salten.

Natur og Samfunn · Alta
Rafsbotn quarry: impact assessment and mitigation for quarry expansion, Alta
Natur og Samfunn assessed the natural environment impacts of extending an existing quarry at Rafsbotn in Alta and described mitigation measures.

Etha · Pyhäjärvi
SENS: underground pumped hydro development at Pyhäsalmi mine, Pyhäjärvi
Etha supports SENS as project development consultant for underground pumped hydro storage at the decommissioned Pyhäsalmi mine.