Westberg · Umeå, Sweden
Kv Verkstad: Risk analysis, Umeå
Six buildings with an underground car park in the Verkstan block at Teg. Westberg provided project support, risk analysis, pre- and post-inspections and vibration monitoring.

The challenge
Six buildings with an underground car park are to be built in the new Verkstan development on Teg.
What we did
Westberg provided project support, carried out a risk analysis, inspected nearby buildings before and after the works, and measured vibrations.
Facts
The project in brief
- Location
- Umeå, Sweden
- Customer group
- Buildings & Infrastructure
- Capabilities
- Air, Noise, Vibration & Odour
- Customer needs
- Manage environmental impacts during construction
Related projects
Similar projects

Relement · Malmö
Varvsstaden: environmental inventory of the Kockums factories, Malmö
The historic Kockums industrial area in Malmö is being converted into retail and housing. Relement has inventoried the buildings and land before remediation of contamination and hazardous building materials.

Relement · Gothenburg
HSB and Balder: Fixfabriken inventory, demolition and remediation, Gothenburg
The former Fixfabriken covers more than 15,000 m² of workshop and surface-treatment buildings from 1947 onwards. Relement handled inventory, demolition and remediation of 13 buildings for HSB and Balder.

Relement · Gothenburg
Aspelin Ramm: HK3 Gamlestaden demolition, remediation, site management and reuse, Gothenburg
SKF's former 17-storey head office from 1967 has undergone extensive asbestos and PCB removal to make room for offices and restaurants. Relement provided remediation, site management and material reuse for Aspelin Ramm.
Contact